Beyond the catalogue: the same SMC composite and the same tooling discipline, applied to drainage, cabling and streetscape.
Storm water in the Gulf is a short, violent event. Gratings and channel covers take the first hit — and they are the items most often replaced after a failed inspection.
Kerbside inlets and channel edges. C250 is the usual class; D400 where traffic sits on the line.
For fibre and power runs. Composite does not block the signal and does not need earthing.
Landscape and streetscape, A15. Sand-cast colours, custom patterns.
Light, non-corroding housings for meter and valve chambers.
Same material for treatment works and coastal sites where steel will not last.
Send a drawing or a sample. New tooling for a non-standard size takes 25–35 days.
Give us the clear opening, the load class and the annual quantity. You get a price, a drawing and a delivery date — usually within two working days.
Request a quote